The bridge at Main Beach is starting to look great. Stop by and take a look. Cleaning will continue, pickets and a rotten 4x4 will be replaced. Once thats done, the bridge will be stained and sprayed with preservatives. Thanks to Chris Clark of Salty Dog Day Care for getting this started.
Thanks to Steve Schena and his friends for getting the chunks of concrete and debris off the beach. It looks great and is a lot safer now. The ramp at Long Point will be repaired this week, probably Wednesday, and the other work should be completed there on the parking lot and field area. Thanks to Edmond Gebhardt for donating his time and equipment to this project. Also, thanks to Hobie Weimer for stripping the Long Point gate and making it ready for painting. Hobie has been working around the properties to fix many things and installed mooring cleats at Bensons Pier. Thanks to Ben Stallings and April Oster for refurbishing picnic tables. We have many more to go. So if anyone wants to help tackle some, let me know. All this work is being made possible because many neighbors are donating their time, expertise, and materials. Without them, all this work would not be possible but this has allowed us to stretch our budget further than we thought possible. There are many more helping and I will be mentioning them over time.
1 Comment
|
Gina DiMicheleBeach Management Corporation Archives
August 2023
Categories
|